K.2.5 Manage the E-PREP : Location and status
Location
For each mission, a project code E-PREPR is created. In MEMO this location is created too. But it is a virtual location.
- Ask the MEMO team to create a real sub location to know exactly where the EQ are.
- Be sure all users of all projects have access to this EPREP project
- During inventory : 2 options : start the inventory from the root of the mission to have at the same time EPREP project and your project. Or, if doing the inventory in 2 steps: inventory regular project / synchronize / inventory E-PREP
The status of the EQ
|
Under E-PREP location |
Under regular/emergency project location |
EQ in stock |
E-PREP |
this situation should not exist |
EQ active |
this situation should not exist |
E-PREP |